2020 Florida Advanced Building Code: Hurricane Mitigation Methodologies
Course Type*
Florida Building Code
2020
Instructor Led
this 2-hour classroom course is designed to be a comprehensive review of wind/hurricane mitigation methodologies specific to opening protection, gable-end bracing, secondary water barriers, roof-to-wall connections and roof-deck attachments during re-roofing as well as the Uniform Mitigation Verification Form.
Contractors Institute
2
Administration
Building – Commercial
Building – Residential
Roofing
Discussion
Handout Materials
Lecture
Date
Attached File
01/15/2021
1031-0-SYLLABUS-2020 ADVANCED 2-HR HURR MIT CLASS.pdf
Date
Attached File
01/15/2021
1031-0-MATERIAL-2020 HURR MITIGATION SLIDES.pdf
01/15/2021
1031-0-MATERIAL-2-HR HURR MIT QUIZ.pdf
Date
Attached File
01/15/2021
1031-0-OUTLINE-2020 ADVANCED 2-HR HURR MIT CLASS.pdf
Date
Attached File
01/15/2021
1031-0-TIMELINE-2020 ADVANCED 2-HR HURR MIT CLASS.pdf
Date
Attached File
01/15/2021
1031-0-OBJECTIVES-2020 ADVANCED 2-HR HURR MIT CLASS.pdf