PRODUCT APPROVAL PROGRAM OVERSIGHT
COMMITTEE (POC)
DS2015-007 by Gary
Kauffman of Digger Specialties, Inc.
Question: Do the aluminum and vinyl railings in question fall within the
scope of 61G20-3?
Answer: No, as per the
definition of “structural component” (see Rule 61G20-3.002) and Rule
61G20-3.001, the products in question fall outside the scope of the state
product approval program. However, these products must meet the
requirements of the Florida Building Code and are subject to approval by the
local authority having jurisdiction.
DS2015-022 by Scott
Knoblock, of Novum Structures
Question: Is a skylight product
ineligible for a Florida Product Approval solely because it is not part of the
building envelope?
Answer: No, as long as the applications/limits of
use of the product in question are limited to those applications where the said
product is directly attached or applied to the building envelope then the
product would fall within the scope of Rule 61G20-3.001. Standalone
(open structure) applications of the product in question fall outside the scope
of the state product approval program. However, Standalone (open
structure) applications must meet the requirements of the Florida Building Code
and are subject to approval by the local authority having
jurisdiction.