1. Name and address of project for which the waiver is requested:

Name:

Street:

City:

Zip Code:






Local Building Department Contact Information
















Applicant Information:


2. Name of Applicant. If other than the owner, please indicate relationship of applicant to owner in space provided:


First Name:

Last Name:

Street:

City:



Zip code:

Phone:

Fax:

Email:

Relationship to owner:


Owner Information:


3. Please enter the owner information below. If the owner and the applicant are not the same person, please upload a written authorization by owner in space provided:




Owner First Name:

Owner Last Name:

Street:

City:



Zip code:

Phone:

Fax:

Email:





Project and Facility Type:



4. Please check one of the following:



5. Type of facility. Please describe the building (square footage, number of floors). Define the use of the building (i.e., restaurant, office, retail, recreation, hotel/motel, etc.)







Description:

Single story block with wood framing for interior mezzanine wall and attic/mezzanine. Modifying the mezzanine to become a music lab ,1025 sq ft.
This is a after school care faciality.



Construction Cost:



6. Project Construction Cost (Provide cost for new construction, the addition, or the alteration):


Summary:

The construction cost is estimated at $35,000. This is not including chair lift for project. The cost of a lift would exceed any support from our funding source(donations ). The estimate that I have gotten range from $15,000 to over $60,000 for the chair lift ,installed price .

Construction Cost upload:


7. Has there been any construction activity on this building during the past three years?



Cost of Construction:

Comments:

This cost was to develope class rooms, and repairs to the building, getting the building to ADA compliant as we are using facility as a after school care. A breakdown of costs to comply to the requirements were as follows; Demo floor and add sewer and waterlines to accommodate three new toilets,sinks and one hi-lo drinking fountain. Repipe from the meter (with a larger supply) to supply new plumbing fixtures. Labor cost and piping costs were $9800. We provided fixtures for same at a cost of $1600,bring total to $11,400.
To provide accessiblity to building as per ADA requirements, we have provided 3 ramps total. One being exterior, and one interior at a cost of $ 2930.00, Handrails for same $1881.50. The 3rd ramp (exterior ) cost of $800. We also had added two exit windows .



Construction Status:




8. Project Status: Please check the phase of construction that best describes your project at the time of this application. Describe status.



*Briefly explain why the request has now been referred to the Commission.


This was reviewed by Duval county, it was referred to Commision for waiver due to hardship of cost . We currently have no wheelchair, students, or the schools we pick up students have none. The extra cost of providing a chair lift to this space would be prohibitive of funding source.



Requirements to be Waived.




9. Requirements requested to be waived. Please reference the applicable section of Florida law. Only Florida-specific accessibility requirements may be waived.


Issue 1: Florida-specific hotel/motel rooms Minimum height in parking structures Accessible parking
Vertical accessibility Toilet rooms
Private Other

The chair lift to this area is cost prohibitive, if the occasion arises to accomadate a wheelchair, to this area we would move the lab to a 1st floor location , or install a lift at that time to accomadate chair. The cost override of the lift itself, providing ,electrical, venting, safe room, and phone/intercom service pushes it close to the $15,000 mark. This is over a 20% additional cost to project . The plan is to run conduit to the respective areas involved , for future if needed


Issue 2: Florida-specific hotel/motel rooms Minimum height in parking structures Accessible parking
Vertical accessibility Toilet rooms
Private Other Need Additional Space
Issue 3: Florida-specific hotel/motel rooms Minimum height in parking structures Accessible parking
Vertical accessibility Toilet rooms
Private Other Need Additional Space


Grounds for waiver.


10. Grounds for Waiver: The Florida Building Commission may grant waivers of Florida-specific accessibility requirements upon a determination of unnecessary, unreasonable or extreme hardship. Please describe how this project meets the following hardship criteria. Explain all that would apply for consideration of granting the waiver.


NOTE:**


Need Additional Space

The cost of providing a lift at this time Would incur expenses beyond what our funder is providing for this project . The estimate that i have gotten verbal from one supplier was verbal and installed $25,000the second is included in this form, to be installed by us, General Contractor. The costs over the lift ,to include electrical requirements and intercom/phone ,also a secure/safe room required .

Cost Estimates For Compliance:










Licensed Design Professional Comments.


11. Licensed Design Professional: Where a licensed design professional has designed the project, his or her comments including his or her signature and professional seal MUST be uploaded.




Comments:
The cost of the chair lift would be cost prohibitive ,for owner getting funding for this . There is accessible space on the 1st floor for students if required.
Design Professional First Name:
Design Professional Last Name: Street Address: City: State:

Zip: Email Address: Phone:


Additional Documentation.


12. Upload Additional Documentation: Please upload any documentation such as plans, photographs and anything that will assist the Council and the Commission to determine the appropriate resolution of your request.