TAC Members Present Via Teleconference: Hamid Bahadori, Chair;   Brad Schiffer;  Kevin Carrier for Tony Apfelbeck; Charlie Frank; James R. Schock; Jeffery Gross; Joe Holland Bobby Dewar for Peter T. Schwab, Amanda Hickman for Joe Belcher

TAC Members not Present:  Robert Hamburger;

Staff Present: Mo Madani,  Robert Benbow, April Hammonds,  Nick Duval

Facilitator: Robert Benbow

Ø Objectives: To Approve Regular Procedural Topics (Agenda and Meeting Summary Report)

Ø To review and accept the draft report for the research project entitled “Evaluating the Economic Impacts of the Legislatively Delayed Provisions of the 5th Edition (2014) Florida Building Code.

Ø To consider, discuss, and provide recommendation for consideration by the Commission regarding DS 2015-113 by David Galassi of Marion County Building Safety Department.

Ø To Consider Public Comment

 

Meeting Minutes

Objective

Discussion of objectives included the following: 

1)

1:30 PM Welcome and Opening, Roll Call.  A quorum was present

2) and 3)

Agenda and Meeting minutes. The Agenda for today’s meeting was amended and agenda item 5 was switched to agenda item 4. The agenda was unanimously approved as amended. The meeting minutes for the August 08, 2015 Fire TAC meeting were approved unanimously by the committee members.

4)

TAC considered, discussed, and provided recommendation for consideration by the Commission regarding DS 2015-113 by David Galassi of Marion County Building Safety Department.

After some discussion, the TAC voted unanimously in agreement with the staff’s answer.

 TAC Actions:

Question: Using table 508.4, does installing a 2 hour separation between the “U” use and the “R” use eliminate the requirement of sprinkling for the Residential use per FBC 903.2.8? 

Answer: No.  As per Sections 420.4 and 903.2.8 of the 5th Edition (2014) FBC, Building, an automatic sprinkler system is required to be provided throughout the building in question.

5)

Objective: To review and accept the draft report for the research project entitled “Evaluating the Economic Impacts of the Legislatively Delayed Provisions of the 5th Edition (2014) Florida Building Code.

 

Rob Viera was present from the Florida Solar Energy Center to give a presentation on the interim report for the research project. The research provides assessment of the potential econmomic impacts of implementing the legislatively delayed requirements of the Florida Building Code, 5th Edition (2014): A second fire service access elevator as contained in Section 403.6.1 of the Florida Building Code.

 

The TAC noted that they would like to see more research on the advantages of adding a second fire service access elevator. After some lengthy discussion a motion was made to accept the interim report as presented by James Schock and seconded by Brad Schiffer. The motion passed unanimously.

6)

Other TAC Business No other TAC business.

7)

Public Comment No public comment

8)

Member Comment No member comment

 