Florida Building Commission

Roofing Technical Advisory Committee

MINUTES

August 06, 2015

1:00P.M.

 

Meeting was conducted via Teleconference/Webinar:

public point of access: Department of Business and Professional Regulation

Northwood Centre, Suite 90A, 1940 North Monroe Street, Tallahassee, FL 32399       (850) 487-1824

 

TAC Members Present: Chairman; Brian Swope, Bob Boyer, Remington Brown, Jimmy Buckner, Billy Cone, Mark Zehnal, Rob Whitcomb for Chuck Goldsmith,  Karen Warseck., Lorraine Ross

Staff Present: Mo Madani, Jim Hammers, Robert Benbow.  Nick Duval  

Ø Objective: To recommend and discuss further continuation of  the research projects on the Corrosion of Roofing and Screen Enclosure Fasteners and a research project on the Impact of Spray Foam Insulation on the Durability of Plywood and OSB Roof Decking

 

Meeting Minutes

Objective

 

1)

 

Welcome and Opening Remarks:  Meeting opened at 1:00pm with meeting protocols regarding muting of phones and personal identification when speaking.

 

2)

Roll Call – Roll Call was taken with a quorum present.

3)

Review and Approval of Meeting Agenda – Motion was entered by Bob Boyer and seconded by Billy Cone to accept the Agenda as posted. Unanimous approval.

4)

Approval of Minutes of June 25, 2015 – Motion was entered by Billy Cone and seconded by Jimmy Buckner to accept the minutes as posted. Unanimous approval.

5)

To recommend and discuss further continuation of the research projects on the Corrosion of Roofing and Screen Enclosure Fasteners and a research project on the Impact of Spray Foam Insulation on the Durability of Plywood and OSB Roof Decking.

Mark Zehnal proposed that the research project follow Dr. Gurley’s Final Report specific to testing for TAS 114 compliance and testing of 1 ¼ inch coil nails. Billy Cone stated that the research project should specify imported vs. domestic fasteners. Mark Zehnal reminded the TAC that the research project needed to focus on fasteners which were being sold in the Florida market. The TAC raised some concerns about the Fasteners not being labeled with their country of manufacturing origin. After much discussion the TAC

 

TAC Actions:

A motion was made by Bob Boyer and seconded by Jimmy Buckner to move forward with Dr. Gurley’s research project proposal to include knowing the country of origin of the fasteners selected for testing and to include testing for TAS 114 Appendix E compliance, testing of 1 ¼ inch coil nails, tile fasteners, and exposed metal panel fasteners. Unanimous approval.

 

 

A presentation was given by Dr. William Miller of Oak Ridge National Laboratory on a risk assessment of sealed attics which have open or closed celled spray foam. In this research they are proposing to be able to judge the danger of various attic systems.

 

TAC Actions:

 

A motion was made as to accept and move forward with Dr. Miller’s proposal as long as the University of Florida was included in the research project by Mark Zehnal and seconded by Brian Swope. Unanimous approval.

 

A motion was made to prioritize the spray foam research project over the fastener research project. The motion failed to pass. Then a motion was made to prioritize the fastener research project over the spray foam research project. Unanimous approval.

6)

Public Comment – No Public Comment

7)

Member Comment – Mo explained to the TAC that the code modification process has been extended six months to January 1, 2016.

8)

Adjournment

 

 

Staff Contacts: Robert Benbow, Robert.benbow@myfloridalicense.com, (850) 717-1828;

Mo Madani, mo.madani@myfloridalicense.com, (850) 717-1825.

Note: This document is available to any person requiring materials in alternate format upon request.  Contact the Department of Business and Professional Regulation, Office of Codes and Standards, 1940 N. Monroe Street, Suite 90, Tallahassee, Florida 32399-0772 or call 850-487-1824.