CHAPTER 3 BUILDING PLANNING
R302.5.1 Opening protection. Openings from a private garage directly into
a room used for sleeping purposes shall not be permitted. Other openings
between the garage and residence shall be equipped with solid wood doors not
less than 13/8 inches (35 mm) in thickness, solid or honeycomb core steel doors
not less than 13/8 inches (35 mm) thick, or 20-minute fire-rated doors,
equipped with a self-closing device.
CHAPTER 6 WALL
CONSTRUCTION
R609.10
Door components.
Substitution of
door components shall comply with either:
(1)
ANSI/WMA
100; or
(2)
Be
evaluated by an approved product evaluation entity, certification agency,
testing laboratory, or engineer and may be interchangeable in exterior door assemblies
if the components provide equal or greater structural performance as
demonstrated by accepted engineering practices.
6th Edition (2017) Florida Building Code,
Energy Conservation
CHAPTER 4 [CE] COMMERCIAL ENERGY EFFICIENCY
C401.2 Application. Commercial buildings shall comply with one of
the following:
1. The requirements of ANSI/ASHRAE/IESNA 90.1, excluding
section 9.4.1.1(g) of the Standard.
2 – 3 No change
CHAPTER 6 [CE] REFERENCED STANDARDS
90.1—2013 Energy Standard for Buildings Except Low-rise Residential Buildings, excluding section
9.4.1.1(g).
C408.2 Mechanical systems and service
water-heating systems commissioning and completion requirements. Prior to the final mechanical and plumbing
inspections, the
licensed deign professional, electrical engineer, or mechanical
engineer registered design professional or approved agency shall
provide evidence of mechanical systems commissioning
and completion in accordance with the
provisions of this section.
No change to the remaining text
C408.2.1 Commissioning plan. A commissioning plan shall be
developed by a licensed deign professional, electrical
engineer, or mechanical engineer registered design professional or approved
agency and shall include the following items:
No change to the remaining text
C408.2.4 Preliminary commissioning report. A preliminary report of commissioning test
procedures and results shall be completed and certified by the licensed design professional, electrical engineer, or mechanical engineer registered design professional or approved agency and provided to the building owner or owner’s authorized agent.
The report
shall be
organized with mechanical and service hot water findings in separate sections
to allow independent review. The report
shall be identified as “Preliminary Commissioning Report” and shall identify:
No change to the remaining text