-Validation Checklist for
State Approval,
Form No. 9B-72.130(3)(b)
TEST REPORT
þVerify the test facility is accredited and approved by the Florida Building Commission.
þVerify testing laboratory’s certification of independence.
þVerify the test reports are for the products listed on the application and that the products are within the scope of Rule 9B-72.
þVerify that the test reports for the products are required by the Building Code as a component of a product approval with the proper category and subcategory.
þVerify that all data on the test reports are substantiated.
þVerify the Code sections and reference standards for which the test report demonstrates compliance.
þVerify the method of demonstrating compliance indicate any limitations on the use of the product, as intended.
þVerify the manufacturer installation instructions, including attachment, are provided and as tested.
þVerify that a quality assurance program audited by a Florida Building Commission approved third party quality assurance agency is in place.
þVerify that no rational
analysis is conducted under this method. Otherwise the evaluation method must be used use another compliance method to seek product approval
þ To the best of my/our knowledge, this application is complete, the items in the checklist above have been verified, and the test report submitted with this application indicates that the product, method, or system described in this application meets or exceeds the Florida Building Code requirements and reference standards listed in the application.