Description:
The use of the building is a Hostel with an owner operated bar in the lobby and a small leased restaurant space
Construction Cost:
Summary:
full renovation of the existing building. Adding one bathroom to an existing room and the rest of the project is just an upgrade to everything in place. New windows, New roof being done.
Comments:
This project was started by someone else without a permit. I was brought in by the investors to take over the project after they go rid of the former owner who did the work without a permit. They replaced the roof and the windows, renovated the lobby and did demo in the rooms. We are now getting the proper permits and approvals so we can finish the project
*Briefly explain why the request has now been referred to the Commission.
This project started by working without a permit. Now that i took over we are getting a permit. We applied for permits with the City of Miami Beach and they requested we get a waiver. We already have a letter of recommendation from the State but not an official waiver
Requirements to be Waived.
Issue 1:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
The building is historic and has steps in the lobby that are historic and not be touched
Issue 2:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space Issue 3:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space