Description:
The space is used for specialized training for athletes.
Need Additional Space
Construction Cost:
Summary:
The costs associated with this alteration, are largely the addition of decking around the pool shell. The pool is prefabricated and just set in place. The deck was built around the shell with space for the equipment below, then stairs and railings. The costs for the decking was approximately $7,000, the pool and equipment were approximately $45,000, we have spent an additional 3,000 in other repairs. Project totaling $55,000.
Cost of Construction:
Comments:
Bathroom was renovated and updated to comply with accessibility requirements.
Construction Status:
*Briefly explain why the request has now been referred to the Commission.
The plans had been designed and approved by our architect with the idea that vertical accessibility would not be required on this type of swim spa for the use specific use cases of Swim Tech Gainesville. The City of Gainesville planning department is requiring this waiver for the project.
Requirements to be Waived.
Issue 1:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
553.505 Exceptions to applicability of the Americans with Disabilities Act.—Notwithstanding the Americans with Disabilities Act of 1990, private clubs are governed by this part.
History.—s. 1, ch. 93-183; s. 14, ch. 96-200; s. 4, ch. 97-76; s. 23, ch. 2001-186; s. 25, ch. 2011-222.
Issue 2:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space Issue 3:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Need Additional Space