Note:
Red type indicates task originated as requirement of a law.
ANNUAL TASKS
1. Report to
2009 Legislature
Schedule:
Commission
identifies and receives draft recommendations 12/12/08
Commission
finalizes recommendations 1/30/09
Commission
report to 2009 Legislature 2/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Commission. Annual task authorized by statute
2007 FBC AND
GLITCH AMENDMENT RELATED TASKS
Schedule:
2007 Code published online 2/1/08
Printed 2007 Codes available to the public 3/1/08
Glitch amendment submittal DEADLINE 7/15/08
Rule development workshop 10/15/08
Rule adoption hearing 12/10/08
Glitch Rule effective 3/1/09
2007 FBC effective 3/1/09
Status: In progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
75%
Origination: Commission. Triennial task subsequent to FBC
Update authorized by statute
6. Evaluate in-home
waste water recycling in coordination with Department of Health and Department
of Environmental Protection (Previous Task 14)
Schedule:
Staff investigate DOH concerns and determine statutory authorities 10-12/06
Department of Health and DEP meeting 2/12/07
Follow-up meeting with DOH 3/08
Department
of Health submits glitch amendment for consistency with 6/1/08
its rule on use of gray
water for landscape irrigation
2007 FBC updated to reflect state
regulations on reuse of gray collection 12/31/08
within a home (See 2007 FBC schedule)
Status: In
progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: Department of Health based on new
in-home collection and reuse systems
seeking approval. Early coordination with DEP.
14. Amend the Florida Energy Code to Require 15% More Efficiency in Buildings (Previous Task 37)
Schedule:
Note: Amendment to achieve Governor Crist’s directive of 15% increased efficiency by January 1, 2009 will be done using procedures of Part VI, chapter 553, F.S. The Energy Code will be amended by administrative rule authorized by that part then the revised Energy Code will be adopted into the 2007 Florida Building Code during the currently scheduled “glitch” cycle.
Evaluation of cost effective building component efficiencies completed 1/08
(See Task 13)
Department of Community Affairs recommendations to the Commission 1/08
Commission considers proposed amendments 1/08-2/08
Rule Development Workshop 3/19/08
Rule Adoption Hearing 5/7/08
Supplemental Rule Adoption Hearing 10/15/08
Rule filed 7/08
Adoption into 2007 FBC via “Glitch” cycle (See Task 2)
Status: In
Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: The Governor directed the
Commission to amend the Florida Energy Code to increase requirements for
building energy efficiency by 15% in Executive Order 2007-127.
17. Develop
mitigation techniques for retrofit of existing site-built residential
buildings: (Previous Task 27)
Schedule:
Identify techniques for initial adoption 5/07-6/07
Commission initiates rule development for
techniques & retrofit mandates 5/09/07
Rule development workshop 6/27/07
Non-rule workshop 8/8/07
Rule adoption hearing 8/22/07
Rule effective 10/10/07
Appoint Workgroup to refine requirements 10/3/07
Workgroup meets to recommend settlement
for FRSA rule challenge 10/3/07
Commission holds telephone meeting to
consider settlement 1/8/08
Workgroup meetings to refine mitigation
techniques for Glitch Cycle 12/13/07
1/28/08
3/19/08
4/18/08
Submit for amendment of 2007 FBC during
Glitch Cycle 5/08
Adopt techniques and retrofit mandates in
2007 FBC via Glitch Cycle
See Glitch Amendment Task 8 schedule
Status: In
Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: Development of mitigation
techniques and adoption as Code requirements as directed by the law was
directed by the 2007 Florida Legislature in CS/HB 7057.
18. Electrical bonding and grounding for swimming pool decks
(Previous Task 28)
Schedule:
Notify
building departments/pool bonding alternative authorized by law 5/07
Develop
alternative technique to NEC 5/07-6/07
Commission
initiates rule authorizing alternative technique 5/09/07
Rule
development workshop 6/27/07
Adopt the alternative in the 2007 FBC 8/22/07
Rule effective 10/1/07
Adopt alternative technique in 2007 FBC via Glitch Amendment
Cycle 2008
See Glitch Amendment Task 8 schedule
Status: In
Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: The 2007 Florida Legislature
directed adoption of the alternative pool bonding requirements by non-Code rule
in 2007 and adoption in the 2007 FBC in CS/CS/SB 2836.
19. Evaluate
elimination of gravel and stone roofing systems (Previous
Task 29)
Schedule:
Appoint Ad Hoc committee to evaluate the
science, alternatives, 8/07
business
impact and impact on birds
Contract with UF to provide technical
assistance 9/07
Workgroup meetings to review data UF reports
on literature search 12/10/07
1/08
3/08
4/18/08
5/6/08
Submit for amendment of 2007 FBC during
Glitch Cycle 5/08
Amend 2007 FBC as determined by study in
Glitch Cycle See Task 8
Status: In Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: The 2007 Florida Legislature directed
the Commission to evaluate the consequences of adopting the International
Building and Residential Codes prohibition of gravel roof systems in high wind
areas before adopting it into the 2007 FBC and to take remedial action if
warranted.
20. Implement
requirements of law for carbon monoxide detectors (Previous Task 32)
Schedule:
Commission initiates special rule development and adoption for 5/9/07
buildings
with fuel burning appliances, fireplaces or attached
garages
and sleeping rooms
Rule
development workshop 6/27/07
Mechanical
and Electrical TACs decide how to reference from NEC 8/21/07
Rule
adoption hearing 8/22/07
Rule
effective (date set by law) 7/1/08
Adopt
and implement above requirements in 2007 FBC in Glitch Cycle 2008
and DBPR hotels with fuel fired boiler requirements DBPR did not adopt a rule
See
Glitch Amendment Task 8 schedule
Status: In Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: The 2007 Florida Legislature
directed the Commission to adopt carbon monoxide detector requirements written
into law as a separate non-Code rule to take effect July 1, 2008 and to adopt
the requirements in law into the 2007 FBC.
OTHER TASKS NOT
SPECIFIC TO THE CODE
16. Work with DCA to evaluate updated energy efficiency
standards for energy using products (Previous Task 25 & 38)
Schedule:
DCA
initiates rule proceeding 8/07
Enter
into contract for study 9/07
DCA
Secretary Pelham addresses Commission suggesting coordination 10/3/08
DCA
conducts Rule Development Workshop 10/18/07
Report
from contractor 11/07
Recommendations
finalized for report to 2008 Legislature 1/30/08
Report
to 2008 Governor 2/08
Update
efficiency standards in Florida Energy Code 5/7/08
Status: Commission denied DCA proposals for
increasing appliance/systems energy efficiency in the Florida Energy Code
update.
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: The Governor directed the
Department of Community Affairs to amend the Florida Appliance Efficiencies to
increase energy efficiency requirements by 15% in Executive Order 2007-127. DCA
Secretary Pelham addressed the Commission and requested its cooperation in
complying with the directives of the Governor’s EO. DCA/Commission staff
presented a plan for increasing efficiency requirements for appliances and
energy using equipment that fall within the authorities of the Florida Energy
Code. The Commission rejected the proposed amendments at its May 2008 meeting
thereby not providing the coordination and cooperation requested by DCA.
25. Investigate
A Consistent Definition of “Bedroom” for Department of Health On-site Septic
System Sizing Regulations
Schedule:
Appoint a Commission Ad Hoc committee 3/19/08
DOH appoint members to work with Commission Ad Hoc committee 3/08-4/08
Task group meetings 5/7/08
10/15/08
Report to Commission and DOH 12/08
Status: In
Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25%
Origination: The initiative to develop consistency between
building department and health department judgements of the number of bedrooms
in a home as it applies to onsite sewage treatment system sizing was suggested
by Commissioner Browdy for two legislative sessions and the joint project with
Department of Health was established by mutual agreement during the 2007
Legislative Session.
28. Develop Legislative Recommendation for Building Code Carbon
Monoxide Detector
Requirements
Schedule:
Mechanical TAC
considers 10/13/08
Expand review to a
workgroup to include additional stakeholder groups 10/15/08
Recommendations to
Commission 12/08
Report to 2009 Legislature 2/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Commissioner Bassett advised the Commission
that the 2007 Law requirements for
carbon monoxide detectors would not provide effective safety for facilities
with boilers. Inquires were made by staff during the 2008 Legislative Session
regarding delegating establishment of criteria to the Commission by rule. The
response was the Commission should work on criteria that could be changed in
law.
30. Develop
Criteria for Evaluation Entity Approval and Adopt by Rule or Develop
Recommendation for 2009 Legislature for Entities to be Recognized in Law
Schedule:
Product Approval POC considers at meetings 8/08-12/08
Recommendation to Commission for vote 12/10/08
Option 1: Recommend adding entities to list in law
Commission includes in report to Legislature (See Task 36) 2/09
Option 2: Establish entity approval criteria by rule
Initiate rule making to adopt criteria 2/09
Report criteria to Legislature in report (See Task 36) 2/09
Rule effective no later than (per HB 697) 7/1/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: The 2008 Legislature directed the Commission
to review the list of Product Evaluation Entities currently identified in law
and either recommend modifications to the list or establish criteria for
approval of additional entities by rule and report on those criteria to the
2009 Legislature.
32. Design
Charette for Hotel Room Accessibility
Schedule:
Charette planning 1/08-10/08
Conducted during December 2008 Commission meeting 12/08
Status: In Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0% 50%
Origination: Accessibility
TAC
33. Evaluate Swimming Pool Entrapment
Standards Application to Existing Pools
Schedule:
Evaluation 2/09-8/09
Proposal
for 2010 Legislature and/or 2010 FBC Update 12/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Plumbing TAC recommendation approved by Commission June
2008. Proposed by Spa and Pool association.
36. Evaluate Need for 4 Hour Bldg Code Core Course as Licensing
Requirement
Schedule:
POC
conducts workshops 08/08-12/08
Recommendation
to Commission for Report to Legislature 12/12/08
Commission
finalizes recommendations for Report 1/30/09
Commission
report to 2008 Legislature 2/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Education POC. Voted approved by Commission
at June 24, 2008 meeting.
37. Evaluate Amending 9B-72.180 on Equivalency of ASTM E 1300-02
and ASTM E 1300-04 and Rule 9B-72.090 on Product Approval Self Affirmation
Schedule:
POC Recommendation to Commission 12/12/08
Rule Proceeding 2/09-4/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Product Approval POC. Voted approved by
Commission at June 24, 2008 meeting.
2010 FBC UPDATE
DEVELOPMENT TASKS
9. Load Side - Wind Pressure Research (Previous Task 19)
Schedule:
Commission approved redirection of WBD
project Phase II 3/07
Amend
contract with UF/ARA 4/07
Contract
for Phase III 9/07
Progress
reporting 9/30/07
12/10/07
1/30/08
Report
on Phase III (Note: August 2008 mtng canceled due to TS Fay) 10/08
& 12/08
Status: Substantially
Complete
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90%
Origination: Hurricane Research Advisory
Committee identified design pressure requirement errors while conducting wind
tunnel testing for the Panhandle wind-borne debris projected directed by the
Legislature. Subsequent research was conducted to provide the base of improved
roof edge design pressure requirements.
10. Resistance
Side – Component and Cladding & MWFRS Research (Previous Task 20)
Schedule:
Legislature
appropriates funding 5/07
Contract
with UF to conduct research 9/07
(Includes
post hurricane building damage assessment survey contingency)
HRAC develops research priority list 1/08
Report
on Phase III 10/08 & 12/08
Status: In
Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40%
Origination: Hurricane Research Advisory
Committee identified building failures in 2004 and 2005 hurricanes, recommended
quick-fixes for some and identified areas needing further research before
standards are established. The Commission sought funding and research work was
initiated in 2007.
22. Evaluate and Adopt the Development Process for the 2010
Florida Building Code (Previous Task 39)
Schedule:
Chairman appoints a study committee 1/08
Committee meets to review and develop recommendation 12/08 – 4/09 Commission conducts public hearing and adopts plan 4/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Chairman
and Staff planning for the 2010 FBC development.
24. Evaluate Hurricane Wind Pressure and Wind Driven Rain Criteria
for Soffit Systems and Establish Labeling Requirements
Schedule:
Appoint workgroup 3/19/08
Include task in UF components and cladding contract 3/08
Workgroup meetings 11/6/08
1/09-6/09
Recommendations ready to
propose for 2010 FBC 6/09
Report to Structural TAC and Commission 2009
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Soffit manufacturers requested
formation of a work group to develop label
requirements similar to the Commission’s action for windows, shutters
and garage doors then expanded the request to include developing installation
requirements. Investigation of performance and development of the basis for
installation requirements is one of the elements of the components and cladding
research being conducted underTask 10.
26. Investigate
Humidity Control Problems for Hot and Humid Climates
(Formerly
2008 Task 11/2007 Task 21)
Schedule:
Conduct workshop on energy efficiency and moisture control 2/28/07
Appoint a workgroup 3/08
Contract with FSEC to organize meetings and provide technical assistance 3/08
Workgroup meetings 5/9/08
5/22/08
6/13/08
For 2010 Florida Building Code 12/09
Status: In Progress
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50%
Origination: Energy and Mechanical TACs out of air
conditioning contractors’ concern for impacts of increased building envelope
efficiencies (sensible heat gain reduction) advocated by window manufacturers
combined with low cost approaches to increased AC equipment efficiencies used
in response to federal standards increases
27. Develop Rule for
Energy Code Cost Effectiveness Test
Schedule:
Begin 1/09
Completed 6/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: The Commission was directed by the 2008
Florida Legislature in HB 7153 to develop a cost effectiveness test criteria by
rule to be applied to justification for increased residential building energy
efficiency requirements.
29. Develop Design
Criteria for Energy Efficient Pool Systems
Schedule:
For 2010 Florida Building Code 12/09
Begin 2/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: During discussions with the
Florida Spa and Pool Association regarding energy efficiency requirements for
pool pumps members suggested improved efficiency could be achieved through
criteria for pool hydronic system design.
31. Develop Improvements for
Gravel Roof Systems
Schedule:
For 2010 Florida Building Code Update 12/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: During the evaluation of whether gravel roof
systems should be prohibited by the 2007 FBC, Task 19, the Florida Roofing and
Sheet Metal Association and Commission agreed to retain gravel roof systems and
apply the HVHZ criteria throughout the state and develop improvements to the
systems.
34. Evaluate Rainwater Collection and Reuse for Process Water in
Coordination with DOH, Health
Officials, DEP and Other Water Management Agencies
Schedule:
(For 2010 Florida Building Code Update) 12/09
Begin 2/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: Plumbing TAC recommendation
approved by Commission June 2008
35. Study
Energy Conservation Measures and Develop a Plan for 20% Increased Efficiency
Requirement for 2010 FBC
Schedule:
TAC considers
options and develops consensus plan 2/09-6/09
Recommendation to
Commission 10/09
5% Code amendment
proposal submitted for 2010 FBC Update 12/09
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: The 2008 Legislature directed the Commission
to enact specific increase in building energy efficiency requirements in HB
7153. This task initiates the study and development of a schedule of increasing
requirements, the first of which are to be enacted in the 2010 FBC whose
development begins in 2009.
38. Evaluate
Adoption of Flood Standards in the
Schedule:
Workgroup
appointed 12/08
Workgroup meetings 1/09-6/09
Recommendations to
Commission 6/09
Proposals for 2010
FBC submitted for adoption 12/09
(See 2010 FBC development schedule)
Status: Pending
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0%
Origination: The Florida Division of Emergency Management
and FEMA requested the policy established in 2000 regarding flood requirements
adoption outside the building code be reviewed. DEM will provide a grant to
fund the project.
COMPLETED TASKS
1. Report to 2008 Legislature (Previous
Task 35)
Schedule:
Commission
identifies and receives draft recommendations 12/12/07
Commission
finalizes recommendations 1/30/08
Commission
report to 2008 Legislature 2/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Commission. Annual task authorized by statute
3. Amend the Florida Accessibility Code
for Building Construction (Previous Task 10)
Schedule:
Rule development workshop 3/28/07
Rule adoption hearing 6/27/07
Supplementary Rule Adoption Hearing on Rule
9B-7.042 8/21/07
Rule Adoption Hearing on Rule 9B-7.003 8/21/07
Supplementary Rule Adoption Hearing on Rule 9B-7.042 10/3/07
Rule Filed 12/21/07
Rule adoption hearing 3/19/08
Rule Filed 4/08
Rule Effective 5/14/08
Note: Code amendment is only
conducted to integrate current chap 553, Part II, F.S. parking requirements
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Accessibility TAC. Access Code amended for
consistency with amended law.
4. Develop Product
Validation Criteria for Methods of Demonstrating Compliance with Code (Previous
Tasks 12 and 31)
Schedule:
Meeting 2/7/06
Meeting 5/3&4/06
Meeting 6/1/06
Recommendations to Commission 7/11/06
Recommendations reviewed and approved by Commission 8/22/06
Rule adoption schedule approved for amending the rule 10/4/06
Product Approval POC review of draft rule 1/24/07
Rule Workshop 2/7/07
Supplemental Rule Workshop 3/28/07
Meeting with Window mfgrs regarding installation instruction info 4/10/07
template for PA
application
Supplemental Rule Workshop 5/9/07
Propose disciplinary procedures for validators pursuant to new authority 6/27/07
added to law by 2007
Legislature (See Task 31)
Rule Adoption Hearing 6/27/07
Supplemental Rule Adoption Hearing 8/21/07
Supplemental Rule Adoption Hearing 10/03/07
Rule Adoption Hearing 1/30/08
Design and implement essential BCIS modifications 9/07- 12/07
Implement rule changes 2/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Product Approval POC. Rules developed pursuant
to requirements of law.
5. Review and Address Code
Administration Needs of Local Governments and Measures to Improve Uniform and
Effective Enforcement of the Code (Previous Task 13)
Schedule:
Assessment survey design and research 5-7/07
On-line
survey designed and conducted 7/07-9/07
Report
on Assessment to the Commission 10/07
Review
Assessment with Code Administration TAC 12/11/07
Code
Administration TAC Develop Recommendations 1/08-3/08
TAC
Recommendations Presented to Commission 5/08
Staff
Analysis of Costs and Resources to Commission 8/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Commission
2006
7. Address implementation
of the electrical systems requirements of the Energy Efficiency Code (Previous
Task 15)
Schedule:
Forum for discussion of requirements and
their implementation 7/10/06
Recommendations
presented to the Commission 7/11/06
Education
and outreach
Florida
Board of Professional Engineers newsletter article
Florida
Engineering Society publication article 10/06
Identification
of Code enforcement and education issue by
Building
Code Education and Outreach Council 9/27/06
Add
notice to Commission’s website 9/06
Send
notice to all parties registered on BCIS for electrical issues 9/06
Notice
Building Officials via BOAF 9/06
BOAF
Education Conference Course 5/07
Include
in Education and Outreach Contract for FY 07-08 7/07
Outreach
provided through BASF project 8/07-
7/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Electrical
TAC during development of the 2007 FBC
8. Develop
Code-Plus criteria for insurance qualification (Previous Task 18)
Schedule:
Determine policy direction 2/07
Contract for development
Phase I 5/07
Reporting to HRAC 8/22/07
Phase II 7/07
Reporting to HRAC 9/30/07
HRAC finalize recommended criteria 9/30/07
Commission decides on performance goal 10/3/07
Commission
finalizes recommendations 12/10/07
Present in report to 2008
Legislature 2/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: 2007
Florida Legislature directive from HB 1-A,
12. Develop a
model energy efficiency ordinance for residential development (Previous Task
22)
Schedule:
Contract for support study 9/07
Public
Input Forum 10/01/07
Establish
work group of stakeholders 10/03/07
Work
group meetings 10/31/07
11/28/07
1/16/08
Draft
ordinance delivered by work group 1/30/08
Commission
public hearings 1/30/08
Recommendation
finalized for report to 2008 Legislature 1/30/08
Report
to 2008 Legislature 2/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: The 2007 Florida Legislature
directed the Commission to develop the model Green Building Ordinance in
CS/HB 7123.
13. Evaluate Florida Energy Code for:
residential cost effective baseline; commercial conservation enhancements, and;
comparison to IECC, ASHRAE 90.1 and 90.2 (Previous Task 23)
Schedule:
Contract
for support study 9/07
Report
from contractor 1/08
Recommendations
developed for Commission 1/08
Department of Community Affairs recommendations to the Commission 1/08
Report
to 2008 Legislature finalized 1/30/08
Report
to 2008 Legislature delivered 2/08
Status: Task
Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: The 2007 Florida Legislature
directed the Commission to evaluate cost effective energy conservation measures
in CS/HB 7123 and CS/CS/SB 2836.
15. Develop and implement public awareness
campaign on energy efficiency and benefits of Green Buildings (Previous Task
24)
Schedule:
Contract
for support services 8/07
Public
Input Forum 10/01/07
Establish
work group of stakeholders 10/03/07
Work
group meetings 10/31/07
11/28/07
1/16/08
Plan
for website approved by Commission 10/03/07
Website
identified and enhanced 9/07
- 12/07
Website
launched 1/08
Public
awareness campaign strategies approved by Commission 1/08
Project phase II initiated 2/08
Status: Task Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: The 2007 Florida Legislature
directed the Commission to develop the model Green Building Ordinance in
CS/HB 7123.
21. Develop Instruction for Manufacturers Obtaining Product
Approval via Associations (Previous Task 36)
Schedule:
Chairman
refers issue back to POC to review existing rule for appropriate process 7/07
Recommendation
to POC and Commission 10/07
Declaratory Statement DCA07-DEC-181
issued 1/3/08
Status: Task
Completed.
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Product
Approval POC
23. Revise Rule 9B-3.050 for:
A. New
Proposed Code Amendment Form/Procedures for Glitch Amendments
Schedule:
Rule Development Workshop 3/19/08
Rule Adoption Hearing 5/7/08
Status: Task Completed
% Complete
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100%
Origination: Authority for Glitch Amendments
granted by the 2007 Legislature in SB 2836. Implementing rules are required.
TASKS DIRECTED BY LAWS
2008 Legislature Directed Tasks
HB
697 Building Code
Action
required:
1. Recommend the Legislature expand the list of
evaluation entities in law or develop and adopt rules for approving evaluation
entities.
“Section 16. Subsection (17) is added to section 553.842,Florida Statutes, to read:
553.842 Product evaluation and approval.—
(17)(a)
The Florida Building Commission shall review the list of evaluation entities in
subsection (8) and, in the annual
report required under s. 553.77, shall either recommend amendments to the list to add evaluation entities the
commission determines should be authorized
to perform product evaluations or shall
report on the criteria adopted by rule or to
be adopted by rule allowing the commission to approve evaluation entities that
use the commission's product evaluation process. If the commission adopts
criteria by rule, the rulemaking
process must be completed by July 1, 2009.”
HB
7153 Energy
Action
required:
1.
Increase
building efficiency requirements of the 2010 Florida Energy Efficiency Code for
Building Construction by 5% for the 2010 relative to the Code which takes
effect December 31, 2009.
2.
Identify
specific building options to achieve the energy efficiency improvements.
3.
Adopt by
rule a cost effectiveness test and apply to the energy efficiency improvements.
“Section 109. Section 553.9061, Florida Statutes, is created to read:
553.9061 Scheduled increases in thermal efficiency standards.--
(1) The purpose of this section is to establish a schedule of increases in the energy performance of buildings subject to the Florida Energy Efficiency Code for Building Construction. The Florida Building Commission shall:
(a) Include the necessary provisions by the 2010 edition of the Florida Energy Efficiency Code for Building Construction to increase the energy performance of new buildings by at least 20 percent as compared to the energy efficiency provisions of the 2007 Florida Building Code adopted October 31, 2007.
:
:
(2) The Florida Building Commission shall identify within code support and compliance documentation the specific building options and elements available to meet the energy performance goals established in subsection (1). Energy-efficiency performance options and elements include, but are not limited to:
(a) Solar water heating.
(b) Energy-efficient appliances.
(c) Energy-efficient windows, doors, and skylights.
(d) Low solar-absorption roofs, also known as "cool roofs."
(e) Enhanced ceiling and wall insulation.
(f) Reduced-leak duct systems.
(g) Programmable thermostats.
(h) Energy-efficient lighting systems.
(3) The Florida Building Commission shall, prior to implementing the goals established in subsection (1), adopt by rule and implement a cost-effectiveness test for proposed increases in energy efficiency. The cost-effectiveness test shall measure cost-effectiveness and shall ensure that energy efficiency increases result in a positive net financial impact.”
2007 Legislature Directed Tasks- Regular Session
CS/HB 7123 Energy
Action required:
CS/HB 7057 Wind Loss Mitigation
Studies and FBC Mitigation Requirements and Standards
Action required:
3. Adopt for site-built
residential buildings by October 1, 2007:
o Mitigation techniques
o Requirement that roof replacement requires
secondary water barrier and roof deck attachment/fastening
o Requirement that within WBD region roof
replacement for buildings insured for $300K or more must also have roof-to-wall
connections upgraded
o Requirement that any permitted activity
valued at $50K or more for buildings located within the WBD region and insured
for $750K or more must also provide for openings protection
4. Adopt in 2007 FBC:
CS for CS for SB 2836 Building Code
Action required:
a) Determine and document the following if
eliminate systems from Code:
o Scientific basis or reason for
elimination
o An available alternative equivalent
in cost and durability
o Whether elimination will
unnecessarily restrict or eliminate business or consumer choice in roofing
systems
o Whether elimination will negatively affect
the nesting habitat of any species of nesting bird; coordination with Fish and
Wildlife Conservation Commission
b) Adopt a rule by chap 120 to preserve use of
gravel or stone roofing systems if the
above conditions cannot be determined and documented
o Review modifications 2151, 2152,
2153, and 2492 and determine based on public comment if there is a continuing
need for any Florida specific requirement of the Code the modifications seek to
repeal
o Adopt or modify the modifications by
chapter 120 only for inclusion in next edition of FBC
o Conduct
study to evaluate cost effective baseline for Florida Energy Code residential
requirements, determine cost effective standards for commercial buildings and
compare to the International Energy Conservation Code and ASHRAE 90.1 and 90.2
in consultation with designated others.
CS for CS for SB 1822 Carbon Monoxide Detectors
Action required:
CS for SB 404 Sprinkling Existing Portions of
Warehouse Expansions
Action required:
CS for SB 2498 Delayed Elimination of Design for
Internal Pressure
Action Required:
2007 Legislature Directed Tasks- Special Session
Florida Building Code Amendments:
Ř “…eliminate all
exceptions that provide less stringent requirements.” than the 2006 IBC and IRC
for wind-borne debris protection.
[HB 1A Section 10 (1)]
Citizens
Insurance criteria for buildings built within 2500 feet of the coast after
2009:
Ř
“…develop
voluntary “Code Plus” guidelines for increasing the hurricane resistance of
buildings.”
[HB 1A Sections 10 (2) and 21 627.351(6)(a)6.]
2006 Legislature Directed Tasks
Florida Building Code Amendments:
Ř
Re-designate
the Wind Borne Debris Protection Region for the Florida Panhandle
COMPLETED
2005 Legislature Directed Tasks
Florida Building Code Amendments:
Expedited Code Amendment
COMPLETED
Ř Shall by November 1, 2005, adopt the ICC provisions for ventless attic spaces. [Section 33 SB 442]
Ř Shall by November 1, 2005, recognize all alarms complying with UL 2017 for the pool alarm option compliance with swimming pool safety requirements of chapter 515 , F.S. [Section 32 SB 442]
Ř Shall consider how to address water intrusion and roof-covering-attachment weaknesses. [Section 34 SB 442]
Ř Shall review Modifications 569 and 570 adopted October 14, 2003 to IBC and repeal, modify or leave the same but 569 and 570 cannot go into effect until the review (leave the same) or rulemaking (modify or repeal) are completed. [Section 48 SB 442]
2004 FBC Glitch Amendments (2006 Annual Amendment to 2004 FBC)
COMPLETED (Implemented
in the 2005 expedited Code Amendment)
Ř Shall amend the 2004 FBC to allow use of the area under mezzanines to be included in the calculation of total floor area when determining the maximum allowable mezzanine area in sprinklered S2 occupancies of Type III construction. Retroactive to the adoption of the 2001 FBC. [Section 44 SB 442]
Ř Shall modify Table 1014.1 of 2004 FBC maximum occupancy loads for R occupancies. [Section 46 SB 442]
Ř Shall amend section 1014.1.2 of 2004 FBC to exempt R1 and R2 occupancies from required distance between exits under certain conditions. [Section 46 SB 442]
2007 Florida Building Code Update
Ř
Eliminate the “interior pressure design” option
for buildings in the wind-borne debris regions consistent with the IBC and IRC.
Special Studies:
Ř Together with building officials from the area, review Hurricane Ivan damage and other data for the region from Franklin County to the Alabama border and issue a report of findings and recommendations to the Governor and 2006 Legislature. [Section 39 SB 442]
Ř Evaluate the definition of exposure category C and make recommendations to the Governor and 2006 Legislature. [Section 41 SB 442]
Ř Study the recommendation that the State be served by a single validation entity for state product approval. [Section 45 SB 442]
Other Tasks:
COMPLETED
Ř Develop a form by rule that is posted on a construction site and identifies all private providers that will be conducting inspections and their contact information. [Section 11 SB 442/ 553.791(4)(c)]
Ř Develop a form by rule for use on the Building Code Information System for petitioning for review of local building official decisions. [Section 9 SB 442/ s.553.775(3)(c)2.]
Ř Add design and construction related facility licensing requirements for Hospice Facilities. [HB 189]