WORKPLAN PRIORITIZATION RANKING EXERCISE RESULTS

Commissioners were asked to rank each of the twenty (20) Workplan Tasks on a five point continuum/scale where a 5 equals the highest level of priority and a 1 equals the lowest level of priority. Members were asked to rank the priority of each topic independently and not in relation to the other topics. Each of the Workplan Task’s rankings were tallied and arranged in order of highest priority (1) to lowest priority (20).

Following are the results of the Commission’s prioritization exercise:

WORKPLAN PRIORITIZATION EXERCISE RESULTS

CONDUCTED OCTOBER 15, 2008

 

 

WORKPLAN TASK

OVERALL RANKING

 

 

39.) Energy conservation measures

1

1.) Report to 2009 Legislature

2

22.) 2010 Code development process

3

9./10.) Research for hurricane resistance Code enhancements

·     window/water leakage

·     window/wall interface

·     soffit performance

4

28.) CO detectors recommendations

5

35.) Develop plan to implement legislated energy efficiency increases

6

27.) Criteria for cost effectiveness test for increases in energy efficiency

7

30.) Develop list of evaluation entities & report to Legislature, or develop criteria for approving evaluation entities by rule

8

26./11.) Indoor Humidity & Moisture Control

9

16.) Efficiency standards for energy using products

10

38.) Evaluate adoption of flood standards in FBC

(DEM, FEMA)

11

25.) Bedroom definition for septic tank sizing with DOH

12

33.) Entrapment standards for existing pools

13

37.)  Evaluate  equivalency of ASTM E 1300-02 and 04 & self affirmation for PA Rule 9B-72

14

24.) Soffit system labeling requirements

14

32.) Design charette for hotel room accessibility

16

31.) Develop enhancements for gravel roof systems

17

34.) Evaluate rainwater collection and use with DOH

18

36.) Evaluate need for Code Core Course requirement for licensing

19

29.) Criteria for energy efficient pool systems

20