WORKPLAN PRIORITIZATION RANKING EXERCISE RESULTS
Commissioners were asked
to rank each of the twenty (20) Workplan Tasks on a
five point continuum/scale where a 5 equals the highest level of priority and a
1 equals the lowest level of priority. Members were asked to rank the priority
of each topic independently and not in relation to the other topics. Each of
the Workplan Task’s rankings were tallied and
arranged in order of highest priority (1) to lowest priority (20).
Following are the results
of the Commission’s prioritization exercise:
WORKPLAN PRIORITIZATION EXERCISE
RESULTS CONDUCTED OCTOBER 15, 2008 |
|
|
|
WORKPLAN TASK |
OVERALL RANKING |
|
|
39.) Energy conservation measures |
1 |
1.) Report to 2009 Legislature |
2 |
22.) 2010 Code development process |
3 |
9./10.) Research for hurricane
resistance Code enhancements ·
window/water
leakage ·
window/wall
interface ·
soffit performance |
4 |
28.) CO detectors recommendations |
5 |
35.) Develop plan to implement
legislated energy efficiency increases |
6 |
27.) Criteria for cost effectiveness
test for increases in energy efficiency |
7 |
30.) Develop list of evaluation
entities & report to Legislature, or develop criteria for approving
evaluation entities by rule |
8 |
26./11.) Indoor Humidity &
Moisture Control |
9 |
16.) Efficiency standards for
energy using products |
10 |
38.) Evaluate adoption of flood
standards in FBC (DEM, FEMA) |
11 |
25.) Bedroom definition for septic
tank sizing with DOH |
12 |
33.) Entrapment standards for
existing pools |
13 |
37.) Evaluate
equivalency of ASTM E 1300-02 and 04 & self affirmation for PA
Rule 9B-72 |
14 |
24.) Soffit
system labeling requirements |
14 |
32.) Design charette
for hotel room accessibility |
16 |
31.) Develop enhancements for
gravel roof systems |
17 |
34.) Evaluate rainwater collection
and use with DOH |
18 |
36.) Evaluate need for Code Core
Course requirement for licensing |
19 |
29.) Criteria for energy efficient
pool systems |
20 |