Rule Development

Cut off Dates

All Applications must be Validated by the Cut-off Date in order to be considered at the next monthly commission meeting. 2009 Product Approval Cutoff Dates

 

Certificate of Independence

Important Notice: For both Evaluation Methods and the Testing Method, applicants must attach a "Certificate of Independence" to their online application. (Please DO NOT mail it to DCA staff.) A Certificate of Independence is requested from the Evaluation or Test Agency (NOT the Validation Entity) certifying that the Test or Evaluation Agency is independent from the Manufacturer. Name it "Certification_of_Independence", convert it to PDF format and attach it to the application at any of the Upload points (Test or Evaluation Report or Installation Instructions).

*All applications using Evaluation by an Architect or Engineer method must send in a signed and sealed hard copy of the evaluation report AND a copy of the online payment receipt showing the FL number. Please send both of these to:

Ted Berman and Associates, LLC
925 41st Street, suite 104
Miami Beach, FL 33140
(305) 868-4707
Fax (786) 206-6017

Other Product Approval Links

Product Approval System

Product Approval Application Process

Product Approval Process Flowcharts

Product Approval Upload Helpful Hints

 



*In 2001, the Product Approval / Prototype Building / Manufactured Building Program Oversight Committee were previously called the Product Approval Ad Hoc and the Manufactured/Prototype Ad Hoc Committees

2008 Archive Rulemaking Notices

9B - 72 RuleMaking
  Notice of Hearing for Rule 9B-72, (August, 2007)
  New Rule V2-7 (doc)
  Validator Discipline (doc) (html)
  Test Report(doc)
  Evaluation Report from an Evaluation Entity (doc)
  Evaluation Report from an Architect or Engineer (doc)
  Certification Method (doc)
  9B-72(doc)
  PAVWG Recommendations (pdf)
  Notice of Hearing for Rule 9B-72, (June,2007)
  Current Proposed Changes to Rule 9B-72-(June2007)



Archive / History