RULE DEVELOPMENT WORKSHOP | 
  |||||
| August 10, 2021 Workshop / Errata | |||||
| TAC | Agenda | Errata Received (.doc) | Post TACs | Post Workshop | |
| Code Admin | Agenda | Errata Received | Code Language Reviewed ( HB401 ) | Approved Code Language | |
| Energy | Agenda | 
 
  | 
    Approved Errata | ||
| Fire | Agenda | Errata Received | Code Language Reviewed (SB286)  | 
    Approved Code Language Approved Code Language  | 
  |
| Roofing | Agenda | Errata Received | Approved Errata | ||
| Special Occupancy | Agenda | Errata Received | Errata Reviewed | Approved Errata | |
| Structural | Agenda | Errata Received | 
          | 
    Approved Errata | |
2021 Supplement to the  7th Edition (2020) Florida Building Code  
  | 
  |||||
  | 
  ||||||||||||||||||||||||||||||||||
  | 
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| SUPPLEMENTS - POST COMMISSION AUGUST 13,2019 | |
Base Document
        | 
    Florida Supplement
       to the 6th Edition ( 2017 FBC )  | 
  
|       
     
 
 
  | 
    |
| Testing Protocols | 
  |
| WorkPlan | |
Audio for Individual Committee Meetings are Available From Here
POST August 2019 Commission Meeting  | 
  |||
| TAC | Tracking Charts | Local Amendments | |
With Comments  | 
    Without Comments | ||
| Accessibility | With | N/A | |
| Code Admin | With | Without | |
| Electrical | With | Without | Local Technical | 
| Energy | With | Without | |
| Fire | With | Without | Local Technical | 
| Mechanical | With | Without | Local Technical | 
| Plumbing | With | Without | Local Technical | 
| Roofing | With | Without | Local Technical | 
| Special Occupancy | With | Without | Local Technical | 
| Structural | With | Without | |
| Swimming Pool | With | Without | Local Technical | 
7th Edition (2020) Florida Building Code – Code Development | 
    
  More than 1 TAC Pulled - Mods taken up by more  than one TAC to be pulled from consent agenda – with different recommendation
TAC Chair-Pulled-Modifications to be  pulled from consent agenda by the TAC Chair for further discussion by the  Commission – comments on these modifications received support from the TAC  during the July TAC meetings. 
TAC_Code_Recommendation_Process
FBC_Code_Approval_Process
  
  Mods with more than one TAC
Post March 2019 TAC Meetings  | 
  ||
Accessibility  | 
    Tracking Chart | 
  | 
  
Code Administration  | 
    Tracking Chart | 
  | 
  
Electrical  | 
    Tracking Chart | |
Energy  | 
    Tracking Chart | 
  | 
  
Fire  | 
    Tracking Chart | |
Mechanical  | 
    Tracking Chart | |
Plumbing  | 
    Tracking Chart | |
Roofing  | 
    Tracking Chart | |
Special Occupancy  | 
    Tracking Chart | |
Structural  | 
    Tracking Chart | |
Swimming Pool  | 
    Tracking Chart | |
March 2019 TACs Meetings
Agendas, Detail reports, Tracking Charts and Local Amendments by TAC
TAC  | 
    Agenda | Detail Report  | 
    Tracking Chart | Local Technical Amendments  | 
  
| Accessibility | Agenda | Detail | Tracking Chart | |
Code Administration  | 
    Agenda | Tracking Chart | ||
Electrical  | 
    Agenda | Tracking Chart | Local Amendments Supplement  | 
  |
Energy  | 
    Agenda | Tracking Chart | ||
Fire  | 
    Agenda | Tracking Chart | ||
Mechanical  | 
    Agenda | Tracking Chart | Local Amendments | |
Plumbing  | 
    Agenda | Tracking Chart | Local Amendments Supplement  | 
  |
Roofing  | 
    Agenda | Tracking Chart | Local Amendments | |
Special Occupancy  | 
    Agenda | Tracking Chart | Local Amendments | |
Structural  | 
    Agenda | Tracking Chart | ||
Swimming Pool  | 
    Agenda | Tracking Chart | 
Step 2 - November 2 to December 15, 2018: period for public to propose modifications to the 6th Edition (2017) FBC and the Commission's approved changes to the 2018 I-Codes needed to accommodate the specific need of the State. 
| POST OCTOBER 2018 COMMISSION MEETING | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Chart #1; Tracking Charts with COMMISSION / TAC Action - Accommodate Florida Specific Need 
  | 
  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
  | 
  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Chart #2; Tracking Charts with  COMMISSION / TAC Action - No Action | 
  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
  | 
  |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
 Tracking Charts with ICC Monograph – Editable Format 
 
  | 
  
Code Review 
 
 
 Post TAC June 2018 Meetings - TAC ACTIONS – Editable Word and Rich Text Format (.rtf) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Tracking Charts Only – Editable Word and Rich Text Format (.rtf) 
 Note: CCC – Code Correlation Committee  | 
  ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||