Description:
Historic building restoration. Building built prior to 1908 but has been abandoned for years. We are cleaning the building out, leaving the structural walls and support in place and restoring the building back to its former glory in the 1900s. It was used as a hotel and restaurant for most of its historical use. We plan to use it as office, retail, restaurant space.
Cost of Construction:
Comments: $25,023 Roof Work and Demo
$9,300 was spent in concrete costs for ramps for each entry way and to fix large cracks in the sidewalk areas for accessibility in the entry way areas.
*Briefly explain why the request has now been referred to the Commission.
The local building department requires a waiver for ADA accessibility and referred me to DBPR. Vertical accessibility requirements are not feasible for this project. Parking accessibility is all public & DOT property, therefore there is no private land for parking with this building. Ramps at entry ways into the building have been built.
Requirements to be Waived.
Issue 1:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
ADA waiver for vertical accessibility to second floor. Costs exceed percentage threshold of overall project cost
Issue 2:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
There is no private land around the building that will allow construction of new parking or alteration of current public parking on DOT and Madison Town property.
Issue 3:
Florida-specific hotel/motel rooms
Minimum height in parking structures
Accessible parking
Vertical accessibility
Toilet rooms
Private
Other
Vertical accessibility and parking accessibility
Grounds for waiver.
NOTE:**
Need Additional Space
Elevator for vertical lift access exceed 75% of total construction cost making this not feasible for this project. I have included elevator quotes in the attachments. These costs are more than 50% of the total construction cost, plus we would have to hire a contractor for the opening, electrical, plumbing, etc adding 25% or more.
Comments:
ADA Waiver for vertical access and parking accessibility
Design Professional First Name:Design Professional Last Name:Street Address:City:State: